Home / Design & Development
Technical Garment Engineering

Design Interpretation & Pattern Development

From initial tech pack analysis and CAD marker optimization to 3D virtual fittings and proto sample sign-off.

Development Capabilities

  • Tech Pack & Bill of Materials (BOM) Review
  • Clo3D Virtual Avatar Fitting & Simulation
  • Gerber CAD Pattern Grading (XS to 4XL)
  • Fabric Consumption & Target FOB Open Costing

Sampling Lead Times

Proto Samples: 7-10 Days
Fit & Size Set Samples: 10-14 Days
Pre-Production (PP) Samples: 14-18 Days